Unusual Electric Utility Pictures

Power Moose
The following picture was taken after new power cables were being strung along the ground at great lengths. An unsuspecting moose, grazing on top of the lines, got his antlers stuck on the cables when, miles away, the crew began pulling the lines into position with their line machinery. As the cables went up, so went the moose. But, after noticing extra tension in the lines, the crew stopped to find the problem. When they saw the moose, he was still alive and the crew lowered him to the ground.


Home  |  About PTS  |  Training Courses  |  In-House Training  |  Calendar
Registration |  Customer List  |  Contact  |  Testimonials  |   Who Attends?
Special Utility Video Clips   |   Glossary   |   Brain Links

Copyright © Professional Training Systems, Inc.
P.O. Box 56000   Portland, OR 97238-6000   Tel: (503) 228-6731   Fax: (360) 834-2771
E-mail: pts@utilitytraining.net    Website: www.utilitytraining.net

PTS, Inc. Electric utility training, classes and worksops.Electric Utility Learning Resources

 

Electric Utility System Operations Training

Electric Utility Business Operations Workshop Training

Electric Distribution Systems Training Class

Customer Aspects of Electric Distribution Systems Training Class

Industrial Electric System Operation Class

EditRegion2